SUBJECT:
Title
A Resolution of the Town Council of the Town of Erie Approving a Construction Agreement with JOC Construction, LLC for the Coal Creek Reuse Waterline Upsizing
Department
DEPARTMENT: Utilities
Presenter
PRESENTER(S): Todd Fessenden, Utilities Director
end
Time
TIME ESTIMATE: 0 minutes
end
For time estimate: please put 0 for Consent items.
Fiscal
FISCAL SUMMARY:
Cost as Recommended: $316,897.74
Balance Available: $575,000
Fund Water Fund
Line Item Number: 500-75-110-605000-257515
New Appropriation Required: No
Policy
POLICY ISSUES:
N/A
Recommendation
STAFF RECOMMENDATION:
Approve resolution
Body
SUMMARY/KEY POINTS
• Current 6” waterline is not sufficient size for demands.
• Replace with new 12” waterline.
BACKGROUND OF SUBJECT MATTER:
On Aug. 11, representatives from the Town met with JOC Construction on-site to review the existing reclaimed water system and discuss ongoing concerns with pressure performance and irrigation reliability. During this walkthrough, the Town provided valuable input on areas most impacted by pressure loss and reduced watering efficiency, particularly in landscaped zones reliant on reclaimed water.
The line is used for irrigation with reuse water to nearby HOA’s and the Erie Community Park. Currently the 6-inch line is causing a restriction in flow because both upstream and downstream sections of the system are larger. Upsizing this section to the right size as the rest of the system will allow for proper flow dynamics so the pumped system can function properly at the Erie Community Park.
priorities
attachments
ATTACHMENT(S):
1. Resolution 25-195
2. Construction Contract