Title: A Resolution of the Board of Trustees of the Town of Erie Approving the First Amendment to the Construction Manager At-Risk (CMAR) Contract with Ellingson-DTD for the Design and Installation of a Horizontal, Directionally Drilled, Municipal Water Well
Attachments: 1. Resolution 21-036, 2. First_Amendment_to_CMAR_Contract, 3. Vicinity Map, 4. Ellingson GMP Proposal
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
SUBJECT: Consent
Title
A Resolution of the Board of Trustees of the Town of Erie Approving the First Amendment to the Construction Manager At-Risk (CMAR) Contract with Ellingson-DTD for the Design and Installation of a Horizontal, Directionally Drilled, Municipal Water Well
Body
DEPARTMENT: Public Works

PRESENTER: Todd Fessenden, Public Works Director
David Pasic, Town Engineer

FISCAL SUMMARY:
Cost as Recommended: $1,077,765
Balance Available (2021 funds): $4,033,800
Fund: Water
FundBudget Line Item Number: 500-70-110-605000-100333
New Appropriation Required: No

STAFF RECOMMENDATION:
Recommendation
Approve the Resolution to amend said agreement, authorizing the appropriate Town officer to execute said agreement and authorize staff to expend budgeted funds.

End

SUMMARY AND BACKGROUND OF SUBJECT MATTER:
Since 2018, the Town has worked closely with Paul Zilis, Town Water Counsel and Leonard Rice Engineers (LRE) to assist with the exploration and development of a water well-field near the North Water Reclamation Facility (NWRF). This well field could provide critical local and redundant source water supply to the Town at a fraction of the cost of obtaining water through more traditional methods such as ditch company rights, buying up senior water rights (agricultural) or Colorado Big-Thompson (CB-T) Project units. In 2020, in order to move the project forward the Board authorized the following:

A. At the July 28, 2020 Board Meeting, the Board Authorized the Award of a Professional Services Agreement with LRE for the well-field and conveyance design and construction support. Staff determined, in the best interest of the Town to bring in a contractor early, under a CMAR contract to work closely with LRE to design and construct a Horizontal Directionally Drilled (HDD) pilot well.

B. On October 21, 2020, staff engaged Ellingson-DTD (Ellingson) as the CMAR to work with LRE during the design phase for the first pilot HDD municipal water w...