Town of Erie
File #: 17-081    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 2/9/2017 In control: Town Council
On agenda: 2/14/2017 Final action:
Title: A Resolution Authorizing the Director of Public Works to Execute a Cooperative Agreement with Boulder County for the State Highway 287 and Isabelle Road (AKA Erie Parkway) Intersection Improvements
Attachments: 1. Cooperative Agreement with Boulder County for SH287 and Isabelle Rd, 2. Resolution
Related files: 20-378
SUBJECT: CONSENT AGENDA
A Resolution authorizing the Director of Public Works to execute a Cooperative Agreement with Boulder County for the State Highway 287 and Isabelle Road (AKA Erie Parkway) Intersection Improvements
Title

Body
DEPARTMENT: Public Works

PRESENTER: Russell Pennington, Deputy Public Works Director
Wendi Palmer, Civil Engineer

FISCAL INFORMATION:
Cost as Recommended: $0
Balance Available: $0
Budget Line Item Number: N/A
New Appropriation Required: No

STAFF RECOMMENDATION: Approving the Resolution to authorize the Director of Public Works to execute a Cooperative Agreement with Boulder County for the State Highway 278 and Isabell Road Intersection Improvements.
Recommendation

End
SUMMARY AND BACKGROUND OF SUBJECT MATTER:
As reported to the Board of Trustees in December, 2016, the intersection of State Highway 287 (SH 287) and Isabelle Rd (AKA Erie Parkway) is within the Colorado Department of Transportation (CDOT) Region 4. CDOT completed an Intersection Priority Study for Region 4 in September 2016. This intersection ranked number 4 for needing improvements to address safety and operational concerns.
This study included a recommendation to widen the east and west approaches of Isabelle to provide a full let-turn lane, a through lane, a through/right-turn lane, and bikeable shoulders. The cost estimate for this improvement was $3,890,000. In the event funding is not available for the desired improvements, the study also included a secondary, lower cost, recommendation that included minimal widening to accommodate left and right turn storage. The cost estimate for this improvement was $460,000.
The Town of Erie is currently conducting a Corridor Study for Erie Parkway from SH 287 to the I-25 interchange. Feldberg Holt, Ullevig (FHU) the Town's consultant performing this study was asked to look at the SH 287 intersection and the CDOT recommendations. The recommendations from FHU were to include the recommendations from CD...

Click here for full text