SUBJECT:
Title
A Resolution of the Town Council of the Town of Erie Approving an Agreement for Professional Services with IronStride Solutions, PC for Consulting Services
Department
DEPARTMENT: Public Works
Presenter
PRESENTER(S): David Pasic, Public Works Director
John Firouzi, Transportation Manager
end
Time
TIME ESTIMATE: 0 minutes
end
For time estimate: please put 0 for Consent items.
Fiscal
FISCAL SUMMARY:
Cost as Recommended: $129,954
Balance Available: $348,600
Fund General Fund
Line Item Number: 100-70-425-560100-000000
New Appropriation Required: No
Policy
POLICY ISSUES:
The Streetlight Standards Development project will touch on multiple policy issues that govern planning, design, construction, operations and maintenance of streetlights in the Town of Erie. The policies would be applicable to both Xcel Energy and United Power service areas.
1) Council Adopted Plans - Review and align expectations associated with utility provider agreements, environmental objectives, budgetary assignments, and service expectations associated with streetlight assets.
2) Municipal Code - Review ordinances governing “dark sky” and environmental lighting requirements to support safety. Create a uniform lighting level tailored to specific land-use and roadway classifications.
3) Engineering Standards - Update specifications for streetlighting including utility feed, light placement, spacing, aerial height, materials, and operability to support long-term service needs.
4) Unified Development Code (UDC) - Establish parameters for land development projects adding streetlight assets and utilities. Define requirements for dedication of assets to the Town upon meeting Town infrastructure standards.
Recommendation
STAFF RECOMMENDATION:
Approve the Resolution
Body
SUMMARY/KEY POINTS
• Stakeholder Input:
o The process includes both internal and external stakeholder input; the project team includes technical specialists that are qualified to educate and advise on streetlights at the policy, program, and project levels.
• GIS Modeling:
o The process includes the development of a visual dashboard for stakeholders to review trade-offs; all existing and future streetlights can be modeled using specialized software to arrive at informed decisions.
• Technical Specifications:
o The ultimate outcome is the development of design standards and specifications; the technical elements will be used to guide planning, engineering, and maintenance functions provided by the Town of Erie.
BACKGROUND OF SUBJECT MATTER:
The Town of Erie is a growing community located in two counties and two utility districts. Historically, the Town has relied on the utility providers for design guidance on streetlights - developers have paid the utility companies to install and operate any light option that meets the general lighting parameters. This has resulted in inefficient High Pressure Sodium (HPS) streetlight installations as well as direct-bury fiberglass poles that do not retain the original requirement. Streetlights have been identified as a strategic asset by the Environmental Division and its ability to support Smart Cities and Safety is a key interest of the Transportation Division. As a result, the Town’s engineering standards and specifications are being updated. The consultant has experience with infrastructure, lighting, and facilitating technical specifications with stakeholder groups.
priorities
.
attachments
ATTACHMENT(S):
1. Resolution