SUBJECT: 

Title
A Resolution of the Town Council of the Town of Erie Approving a Construction Contract with C.R. Contracting for the Airport Pavement Maintenance

 

Department

DEPARTMENT:                     Public Works

Presenter

PRESENTER(S):                     David Pasic, Public Works Director

end

 

Time

TIME ESTIMATE: 0 minutes
end

 

Fiscal
FISCAL SUMMARY:

Cost as Recommended:                                           $428,854.00

Balance Available:                                                                 $489,847.00

Fund                                                                                                          Airport Fund

Line Item Number:                                                                530-70-110-605000-100168

New Appropriation Required:                       No


Policy

POLICY ISSUES:

Maintaining Town Infrastructure (such as the Airport pavement) meets the Town’s policy of ensuring safety and meeting Federal Aviation Authority (FAA) Grant Assurances. In doing so, the Town remains fiscally responsible to federal and state grants.

 

Recommendation

STAFF RECOMMENDATION:

Approve the resolution

Body

SUMMARY/KEY POINTS

                     Pavement maintenance needed at the airport.

                     Grant funded by the Federal Aviation Administration (FAA), Colorado Division of Aeronautics (CDOA), and the Town.

 

BACKGROUND OF SUBJECT MATTER:

The 2026 Capital Budget includes funds for pavement maintenance at the Erie Municipal Airport. On March 24, 2026, Council approved a grant from Colorado Division of Aeronautics (CDOA). On Mar 2, 2026, the Town entered into an agreement with Lochner for design services.

 

Lochner prepared and requested bids on April 1, 2026. Two bids were received on April 29, 2026. The low bidder was CR Contracting with a bid amount of $428,854.00.

 

The combination of the design contract with Lochner for $99,700 and construction costs plus an estimated $1,000 for administration expenses (such as advertising costs) puts the project total at $529,554.00.

 

The Town is working with the Federal Aviation Administration (FAA) for a grant that will be brought to Council at a future meeting. The total funding breakdown is as follows:

 

Funding Summary

                     FAA                     $243,403.00

                     CDOA                     $252,411.00

                     Town                     $33,740.00

                     Total                     $529,554.00

 