File #: 24-392    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 8/6/2024 In control: Town Council
On agenda: 9/24/2024 Final action:
Title: A Resolution of the Town Council of the Town of Erie Approving a Construction Contract with Adiona Transportation Solutions, LLC for the Sheridan Parkway Ridge View Intersection Traffic Signal Project
Attachments: 1. Resolution 24-131, 2. Budget Change Request, 3. Adiona Contract executed
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT: 

Title

A Resolution of the Town Council of the Town of Erie Approving a Construction Contract with Adiona Transportation Solutions, LLC for the Sheridan Parkway Ridge View Intersection Traffic Signal Project

Body

 

DEPARTMENT:                                           Public Works 

Department

 

PRESENTER(S):                                           David Pasic, Interim Public Works Director

                                                                                    Jonathan Williams, Civil Engineer

First Name Last Name, Title

 

FISCAL SUMMARY:

Cost as Recommended:                                           $778,811.80

Balance Available:                                                                 $778,811.80

Budget Line Item Number:                      300-70-710-605000-100412

Budget Transfer:                                                                $728,812 from 300-70-110-605000-100369

New Appropriation Required:                       No

 

POLICY ISSUES:

Transfer of 2024 funds to a higher priority project and then replenishment through the 2025 budget.

 

STAFF RECOMMENDATION:

Recommendation

Approve the Resolution

End

 

SUMMARY AND BACKGROUND OF SUBJECT MATTER:

In the Spring of 2023, the Town with its consultant, Fox Tuttle, performed a signal warrant analysis for the intersection of Sheridan Parkway and Ridge View Drive. This analysis concluded a signal at this location was necessary. Given the shared jurisdictional location of the signal between Erie and Broomfield, Erie and Broomfield entered in to an Intergovernmental Agreement specifying that Broomfield would reimburse Erie for a portion of the signal installation cost. Further, the Town will provide ongoing maintenance for the signal with reimbursement support from Broomfield. 

 

The Town hired consulting firm Kimley Horn to design the signal improvements. The signal layout accommodates the existing intersection geometry and has also been designed to accommodate future expansion of Sheridan Parkway as identified by Broomfield and the Town. Town staff separated the signal bid into Schedule A and B. Schedule A work will include all underground signal work, curb gutter, and ADA ramp replacement, and Schedule A will be completed by the Contractor in 40 days later this Fall. Schedule B work will include long lead time items including the signal poles, mast arms, and a signal controller, staff anticipates these items will arrive on site next spring. The agreement allows the contractor an additional 20 days to complete Schedule B work upon arrival of these materials. 

 

Staff posted a request for construction bids on BidNet Direct for the Sheridan Parkway Ridge View Intersection on July 2, 2024. The request for bids required potential bidders to submit pricing for Schedule A and B of the Sheridan Parkway Ridge View Traffic Signal Project.

 

Staff then held a non-mandatory pre-bid meeting on July 16, 2024.

 

Contractors submitted the following bids on August 1, 2024.

 

Contractor                                                               Base Bid Amount                                          Bid Bond Included

Adiona Transportation                      $728,811.80                                                               Yes

Lighthouse Transportation                     $732,012.10                                                               Yes

Lumin8                                                               $816,259.20                                                               Yes

Morton Electric                                          $738,997.50                                                               Yes

Sturgeon Electric                                          $844,011.00                                                               Yes

Engineers Estimate                                          $1,037,522.50

 

Adiona Transportation Solutions is the low and most qualified bidder.

 

The project improvements will include:

Installing a traffic signal, revising handicap ramps for ADA compliance, and minor striping modifications. 

 

Staff checked references for Adiona Transportation Solutions, LLC, and staff believe they are qualified to construct the project.

 

Funding for this project is included in the budget for FY 2025. However, due to safety concerns at the intersection, staff is asking for the Town Council to transfer $778,811.80 from Budget Line Number 300-70-110-605000-100369 (North Roundabout) to 300-70-110-605000-100412 (Sheridan Parkway Ridge View Intersection Traffic Signal) so installation work can begin this year. The funds requested in the budget for FY 2025 for this project will be transferred once the 2025 budget takes effect to replenish the North Roundabout account.

 

Sufficient funding is included in the budget including:

Contract amount:                                          $728,811.80

Contingency:                                                               $  50,000.00

Total                                                                                    $778,811.80

 

Staff believes it is in the Town's best interest to construct the project with an anticipated Substantial Completion date of 20 days after Schedule B Notice to Proceed (approximately Spring 2025) and a Final Completion date 30 days after Substantial Completion. Staff recommends awarding the construction contract to Adiona Transportation for $728,811.80 and a contingency amount of $50,000.00 for a total contract amount of $778,811.80.

 

COUNCIL PRIORITY(S) ADDRESSED:

ü                     Prosperous Economy

ü                     Well-Maintained Transportation Infrastructure

ü                     Safe and Healthy Community

ü                     Effective Governance

ü                     Fiscally Responsible

 

ATTACHMENT(S):                      

1.                     Resolution

2.                     Agreement