Title: A Resolution of the Town Council of the Town of Erie Approving a Construction Contract with GLH Construction, LLC, for the Colliers Hill Detention Pond Improvements.
Attachments: 1. Resolution 26-005, 2. Vicinity map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT: 

Title
A Resolution of the Town Council of the Town of Erie Approving a Construction Contract with
GLH Construction, LLC, for the Colliers Hill Detention Pond Improvements.

 

Department

DEPARTMENT:                     Public Works
Utilities


Presenter

PRESENTER(S):                     David Pasic, Public Works Director

Kieth Fiebig, Town Engineer
end

Wendi Palmer, Civil Engineer III

Time

 

TIME ESTIMATE: 0 minutes
end

For time estimate: please put 0 for Consent items.

 

Fiscal
FISCAL SUMMARY:

Cost as Recommended:                                           $403,074.75

Balance Available:                                                                 $1,250,000

Fund                                                                                                          Urban Renewal Authority

Line Item Number:                                            800-90-605000-110402

New Appropriation Required:                       No


Policy

POLICY ISSUES:

Whether to use budgeted funds for the construction of planned improvements to Colliers Hill Detention Pond.

 

Recommendation

STAFF RECOMMENDATION:

Approve the Resolution to award the contract to GLH Construction, LLC to proceed with this project.

Body

SUMMARY/KEY POINTS

•                     Construct improvements to the existing detention pond outlet to improve drainage and maintenance access.

 

BACKGROUND OF SUBJECT MATTER:

In 2024, the Town hired an engineering consultant to evaluate storm flows from the Colliers Hill Detention Pond. The consultant determined the outlet structure was not functioning in accordance with the original design intent.

 

Staff posted a Request for Proposals on BidNet Direct on March 19, 2025, to hire a another consultant to design modifications to the detention pond outlet structure.

 

On April 22, 2025, the Town received five proposals. Staff reviewed and scored the five proposals; RESPEC and Merrick were tied in the overall score, but RESPEC’s proposed fee is $74,200 and Merrick’s is $117,020. As a result, staff approved a Professional Services contract with RESPEC for the design.

 

Staff then posted a Request for Construction bid on BidNet Direct Nov. 12, 2025, for the construction of the Colliers Hill Detention Pond Improvements.

 

Contractors submitted the following bids on Dec. 23, 2025.

 

                    Contractor                                                               Bid Amount                         Bid Bond Included

GLH Construction, LLC

$403,074.75

Yes

RCD Construction, Inc.

$424,988.01

Yes

Tuston Construction, LLC

$439,930.00

Yes

Elevated Excavating, Inc.

$479,698.71

Yes

Rock & Co. Inc.

$484,721.16

Yes

Hallmark, Inc.

$513,492.00

Yes

Defalco Construction Co.

$533,520.29

Yes

CPC Constructors, Inc.

$534,991.00

Yes

L & M Enterprises, Inc.

$545,220.00

Yes

Alpine Civil Const. Inc.

$553,134.00

Yes

Bedrock, LLC

$563,066.75

Yes

Standard Concrete, Inc.

$578,217.50

Yes

Dietzler Const. Corp.

$595,181.00

Yes

Sterling Constructors LLC

$617,169.75

Yes

Duran Excavation, Inc.

$618,589.00

Yes

Naranjo Civil Const., Inc.

$666,422.00

Yes

Frontier Env. Services, Inc.

$675,865.00

Yes

Timber Wolf Excavating

$691,575.00

Yes

Elite Surface Infrastructure

$793,821.00

Yes

Caraveo Const., Inc.

$1,124,940.00

Yes

 

Engineers Estimate                                          $504,605.00

 

GLH Construction, LLC is the lowest and most qualified bidder.

 

This project will improve the detention pond outlet structure to lower release rates at or below historic and provide an outlet structure that will be easy to access and maintain. This will improve drainage downstream from this detention pond.


priorities

attachments

ATTACHMENT(S):

1.                     Resolution 26-005

2.                     Construction Contract

3.                     Vicinity Map