Legislation Details

File #: 18-127    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 3/14/2018 In control: Town Council
On agenda: 3/27/2018 Final action:
Title: A Resolution Authorizing the Award of a Contract to Aquatic Chemical Solutions, Inc. for the Design and Installation of Pool Play Structure at the Erie Community Center Pool in the Amount of $118,950.00; And, Setting Forth Details In Relation Thereto
Sponsors: Parks & Recreation, Farrell Buller
Attachments: 1. Aquatic Chemical Solutions, Inc. Proposal, 2. Contract, 3. Resolution
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT:  Consent

Title

 

A Resolution Authorizing the Award of a Contract to Aquatic Chemical Solutions, Inc. for the Design and Installation of Pool Play Structure at the Erie Community Center Pool in the Amount of $118,950.00; And, Setting Forth Details In Relation Thereto

 

Body

DEPARTMENT:  Parks & Recreation

 

PRESENTER:  Farrell Buller, Parks & Recreation Assistant to the Town Administrator - Community Services

 

FISCAL INFORMATION:

Cost as Recommended:  $ 128,466.00

Balance Available:  $ 130,000.00

Budget Line Item Number:  100-50-820-605000-100246

New Appropriation Required:  No

 

STAFF RECOMMENDATION:

Recommendation

 

Approve Resolution Authorizing the Award of a Contract to Aquatic Chemical Solutions, Inc. for the Design and Installation of Pool Play Structure at the Erie Community Center Pool in the Amount of $118,950.00.

 

End

 

SUMMARY AND BACKGROUND OF SUBJECT MATTER:

 

In the 2018 budget, the Board of Trustees authorized funds for the replacement of the pool play structure in the Erie Community Center zero depth pool. A Request for Proposals was issued on February 21, 2018. The following three companies submitted design proposals and quotes:

Vendor                                                                                                         Quote

Recreation By Lemmie Jones, LLC                                          $ 106,000.00

Aquatic Chemical Solutions, Inc.                                          $ 108,925.00

CEM Sales and Service                                                               $ 109,450.00

 

Analysis completed by staff determined Aquatic Chemical Solutions to be the preferred vendor. Some of the deciding factors:

•                     Overall costs are within budget

•                     Provided more play elements on activity tower than other vendors

•                     Play elements are playCONNECT™ - Industry’s first modular feature mounting system for activity towers, allowing the ability to add, remove or replace features with playCONNECT™ to extend the lifetime of the structure 

•                     Activity tower is constructed of stainless steel

•                     Activity tower has an integrated manifold with the controller in the arms allowing for design of the hydraulic requirements

•                     Vendor has proven record with the Town of Erie, having completed other upgrade projects and routine maintenance at the Erie Community Center pool

•                     Vendor is a Colorado vendor and able to complete the project within the specified timeframe as well as assist with pre-installation tasks at no additional cost

•                     Positive reference verification

 

With the selection of Aquatic Chemical Solutions, the available funds allow for inclusion of Alternate #1 as shown on their proposal attached to this agenda item.

 

Below is the project budget. These funds are currently available in the line item for this capital improvement.

 

Base Bid                                          $108,925.00

Alternate #1                                          $  10,025.00

8% Contingency                     $    9,516.00

Total                                                               $128,466.00

 

The anticipated project schedule is as follows:

Notice of Award                                                               March 28, 2018

Notice to Proceed                                          April 16, 2018

Work to commence                                          August 20, 2018

Substantial Completion                                           September 3, 2018

 

 

ATTACHMENTS:                      

 

1.                     Aquatic Chemical Solutions, Inc. Proposal

2.                     Contract

3.                     Resolution