Legislation Details

File #: 2026-374    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 6/3/2026 In control: Town Council
On agenda: 6/23/2026 Final action:
Title: A Resolution of the Town Council of the Town of Erie Approving a Fourth Amendment to Construction Contract with HDR Engineering, Inc., for the Erie Lake Dam Seepage Rehabilitation Investigation, Analysis, and Design
Attachments: 1. Resolution 26-107, 2. Amendment
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT: 

Title
A Resolution of the Town Council of the Town of Erie Approving a Fourth Amendment to Construction Contract with HDR Engineering, Inc., for the Erie Lake Dam Seepage Rehabilitation Investigation, Analysis, and Design

 

Department

DEPARTMENT:                     Utilities

Presenter

PRESENTER(S):                     Bruce Chameroy. Water and Wastewater Division Manager                     

Weston Ring. Utilities Project Manager
end

 

Time

TIME ESTIMATE: 0 minutes
end

For time estimate: please put 0 for Consent items.

 

Fiscal
FISCAL SUMMARY:

Cost as Recommended:                                           $37,891.06

Balance Available:                                                                 $1,241,259.04

Fund                                                                                                          Water Fund

Line Item Number:                                            500-75-110-605000-257502

New Appropriation Required:                       No


Policy

POLICY ISSUES:

Town Council must approve amendments to previously approved agreements in accordance with the Town’s Purchasing Policy.

 

Recommendation

STAFF RECOMMENDATION:

Approve the resolution.

Body

SUMMARY/KEY POINTS

                     The Erie Lake Dam Seepage Rehabilitation Project is currently under construction.

                     During construction it was discovered that the Lake’s outlet works needed to be repaired and renovated.

                     HDR requires an amendment to their Professional Services Agreement in order to complete this additional design work.

 

BACKGROUND OF SUBJECT MATTER:

The Colorado Dam Safety Office of the State Engineer (SEO) performed the annual inspection for Erie Lake Dam on Sept. 26, 2022 and observed pooling water at the downstream toe of the dam, located along the southwest portion of the embankment. SEO instructed Town staff to institute a daily monitoring plan and to update data on a shared file with photographs and measurements. On Sept 27, 2022, the Utilities staff cleared vegetation from the wet area and identified the active source of seepage. The Town’s Utilities department contacted HDR for support on evaluating the seepage issue. HDR was to perform a data/records review of pertinent available documentation, perform an onsite dam examination, and deliver a technical memo of findings and recommendations. Subsequently HDR was engaged to perform design of the selected remedy, that work has been concluded and the project is under construction.

 

During construction it was discovered that the lake’s outlet works needed to be repaired and renovated. This amendment to HDR’s contract will allow them to complete the required work.

priorities

.

attachments

ATTACHMENT(S):

1.                     Resolution

2.                     Amendment