Title: A Resolution of the Town Council of the Town of Erie Approving a Professional Services Agreement Amendment with RockSol Consulting Group for the Downtown Infrastructure Alley Project
Attachments: 1. Resolution 25-157, 2. Partially Executed Amendment 1, 3. Vicinity Map
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT: 

Title
A Resolution of the Town Council of the Town of Erie Approving a Professional Services Agreement Amendment with RockSol Consulting Group for the Downtown Infrastructure Alley Project

 

Department

DEPARTMENT:                     Public Works
    

    
Presenter

PRESENTER(S):                     David Pasic, Director of Public Works

Jonathan Williams, Civil Engineer
end

 

Time

TIME ESTIMATE: 0 minutes
end

 

Fiscal
FISCAL SUMMARY:

Cost as Recommended:                                           $128,728.00

Balance Available:                                                                 $1,153,309.28

Fund                                                                                                          Storm Drainage Operating Fund

Line Item Number:                                                                340-70-110-605000-150000

New Appropriation Required:                       No


Policy

POLICY ISSUES:

The policy issue before Council is whether to expend budgeted funds for legal descriptions and acquisition services necessary to acquire Temporary Construction Easements for the Briggs Street Alley Project.

 

 

Recommendation

STAFF RECOMMENDATION:

Approve the Resolution

Body

SUMMARY/KEY POINTS

                     The Briggs Street Alley Project requires acquisition of 39 Temporary Construction Easements.

                     RockSol will provide oversight to generate legal descriptions and parcel acquisition services through an addendum to the original contract.

 

BACKGROUND OF SUBJECT MATTER:

Alleys on the 500 and 600 blocks adjacent to Briggs Street are located in unimproved right of way, lacking proper drainage conveyance and can be difficult to access following storm events. Both businesses and residents use the alley for deliveries and access to properties on a daily basis. 

 

A 60% design plan set was completed by Rocksol for the Briggs Street Alley Project.  Based on this design, a total of 39 Temporary Construction Easements need to be acquired prior to beginning construction on the project. Each easement will require a legal description, title work, appraisal, and meetings with the property owners. In addition to the easements as identified in the plans, some costs for revisions to the easements based on meeting with each property owner have also been assumed in the scope of work.

The total cost of the addendum request is $128,728.00. This includes $19,600 for 39 legal descriptions, and $109,128 for parcel acquisition negotiation and closing services.  Easement acquisition services could not be included in the original contract scope of services because the number of parcels impacted for grading and driveway connections was unknown at that time.

Easement acquisition services are expected to take approximately one year. Construction for this project is anticipated to begin after easement acquisition concludes which is anticipated to be in late 2026 or early 2027.

 


priorities

TOWN COUNCIL PRIORITY(S) ADDRESSED:

Attractive Community Amenities

Engaged and Diverse Community

Prosperous Economy

Well-Maintained Transportation Infrastructure

Small Town Feel

Safe and Healthy Community

Effective Governance

Environmentally Sustainable

Fiscally Responsible

 

attachments

ATTACHMENT(S):

1.                     Resolution

2.                     PSA Amendment

3.                     Vicinity Map