File #: 25-366    Version: 1 Name:
Type: Consent Agenda Status: Agenda Ready
File created: 5/29/2025 In control: Town Council
On agenda: 6/24/2025 Final action:
Title: A Resolution of the Town Council of the Town of Erie Approving a Development Agreement and Accepting Dedications as shown on the Final Plat for the Summerfield Filing No. 2 Subdivision
Attachments: 1. Resolution 25-113, 2. Development Agreement, 3. Summerfield Filing No. 2 Final Plat
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

SUBJECT: 

Title
A Resolution of the Town Council of the Town of Erie Approving a Development Agreement and Accepting Dedications as shown on the Final Plat for the Summerfield Filing No. 2 Subdivision

 

Department

DEPARTMENT:                     Planning & Development
    

    


Presenter

PRESENTER(S):                     Chris LaRue, Principal Planner


end

 

Time

TIME ESTIMATE: 0 minutes
end

For time estimate: please put 0 for Consent items.

 

Fiscal
FISCAL SUMMARY:

N/A


Policy

POLICY ISSUES:

Staff’s analysis indicates the proposed Development Agreement (DA) and proposed dedications are consistent with the Town Charter and Municipal Code. Approving the Resolution and Ordinance will confirm Council’s agreement with staff’s analysis and conclusions.

 

Recommendation

STAFF RECOMMENDATION:

Approve the Development Agreement and accept the dedications shown on the Summerfield Filing 2 Final Plat subdivision. 

Body

SUMMARY/KEY POINTS

                     For the Summerfield development to proceed, Town Council must approve the Development Agreement (DA) and accept the dedications on the Summerfield Filing No. 2 Final Plat.

                     Final Plat No. 2 consists of 204.36 acres and replats several tracts within Summerfield Filing No. 1 (mix of single-family Blocks 1-5, 8 & 9 and duplex Blocks 6 & 7) into 191 lots and 8 tracts. Of the 191 lots, 135 are planned as active adult homes.

                     Among other common requirements, the DA restricts the movement at the intersection of Meadow Boulevard and State Highway 52 to a 3/4 movement (i.e. all movements into and out of a development except a left turnout) until a traffic signal is installed. Per DA requirements, the applicant shall apply to CDOT for a traffic signal at that intersection within 30 days of the effective date of the DA. The traffic signal must be installed when warranted and approved by CDOT.

 

BACKGROUND OF SUBJECT MATTER:

The overall Summerfield Development is located south of Highway 52, north of Weld County Road 12, and between Weld County Roads 5 and 7. Final Plat No. 2 consists of 204.36 acres and replats several tracts within Summerfield Filing No. 1 (mix of single-family Blocks 1-5, 8 & 9 and duplex Blocks 6 & 7) into 191 lots and 8 tracts. Of the 191 lots, 135 are planned as active adult homes. This application is consistent with the previously approved Summerfield Preliminary Plat No. 1 and the PUD zoning.

The Development Agreement (DA) includes standard Town of Erie requirements to develop the site as well as exhibits outlining phasing and cost estimates for the public improvements the developer will install. Provisions included were negotiated by Town staff with the Town Attorney’s counsel and the property owner, Toll Brothers (TL Summerfield, LLC). Among other typical Town language, the DA contains provisions addressing fees and public improvements, including reimbursements to the Town for public improvements. Improvements include streets and sidewalks, right-of-way landscaping and irrigation, utilities, and private improvements with public importance.

Site History and Prior Approvals

1.                     Annexation

a.                     The overall Summerfield area was annexed by the Town in January 2013.

 

2.                     Zoning

a.                     Summerfield was initially zoned Planned Development (PD) at the time of annexation.

b.                     The Summerfield PD depicts various planning areas and allows a maximum of 2,200 residential units and 500,000 square feet of commercial uses.

3.                     Plats

a.                     2013: The Town Board of Trustees reviewed a Sketch Plan for the overall property. A Sketch Plan is an optional, informal evaluation before detailed planning and engineering work is undertaken and does not result in a formal decision.

b.                     2022: Preliminary Plat No. 1 was approved by the Town Council and consists of 508 single-family detached lots, 138 duplex lots, and 198 townhome (single-family attached) lots, for a total of 844 lots, with 43 tracts for various landscaping, trail, park, open space, alleys/private streets, and utility purposes and future development areas.

c.                     2023: Summerfield Filing No. 1 Final Plat and Development Agreement (DA) was approved by Town Council. Filing No. 1 created 479 lots and 36 tracts consisting of 158 active adult single-family detached, 100 active adult attached homes, 196 traditional detached homes, and 25 traditional townhomes. Some of these areas are currently under construction. Infrastructure is anticipated to be completed in the fall of this year with sales possibly beginning the end of 2025 or beginning of 2026.

 

The area for Final Plat No. 2 is contained within Filing No. 1 future development tracts B, J, AD, and AE.

 

d.                     2025: Preliminary Plat No. 2 was approved by the Town Council for roughly the southern half of the Summerfield site. The plat consists of 361.39 acres and proposes 1,301 lots (517 traditional single-family detached, 534 active adult single-family detached, 144 active adult duplexes, & 106 traditional townhomes) and 52 tracts.

 

Summerfield Filing No. 2 Final Plat

Development Information:

                     Plat Size:                                          204.36 acres

                     Number of Lots:                     191 lots

                     Number of Tracts:                     8 tracts

 

Development Agreement

Staff negotiated a Development Agreement (DA) in concert with the Final Plat. The agreement includes cost estimates and reimbursement provisions for public infrastructure associated with the development. These provisions address public improvements identified as part of the development review process.

The DA restricts the movement at the intersection of Meadow Boulevard and State Highway 52 to a 3/4 movement (i.e. all movements into and out of a development except a left turnout) until a traffic signal is installed. Per DA requirements, the applicant shall apply to CDOT for a traffic signal at that intersection within 30 days of the effective date of the DA. The traffic signal must be installed when warranted and approved by CDOT.

Action Items

The Town Council is the approval body for both the DA and the acceptance of dedications as shown on the Final Plat.


priorities

TOWN COUNCIL PRIORITY(S) ADDRESSED:

Attractive Community Amenities

Engaged and Diverse Community

Prosperous Economy

Well-Maintained Transportation Infrastructure

Small Town Feel

Safe and Healthy Community

Effective Governance

Environmentally Sustainable

Fiscally Responsible

 

attachments

ATTACHMENT(S):

1.                     Resolution No. 25-113

2.                     Development Agreement

3.                     Summerfield Filing No. 2 Final Plat