Legislation Details

File #: 24-484    Version: 1 Name:
Type: General Business Status: Tabled
File created: 10/3/2024 In control: Town Council
On agenda: 10/22/2024 Final action:
Title: PUBLIC HEARING: An Ordinance of the Town Council of the Town of Erie Adopting New Water Tap Fees, Fees in Lieu of Water Dedication and Wastewater Tap Fees
Attachments: 1. Ordinance 039-2024; Adopting New Water Tap Fees, Fees in Lieu of Water Dedication and Wastewater Tap Fees, 2. Presentation

SUBJECT: 

Title

PUBLIC HEARING:   An Ordinance of the Town Council of the Town of Erie Adopting New Water Tap Fees, Fees in Lieu of Water Dedication and Wastewater Tap Fees

 

Body

 

DEPARTMENT:                     Finance Department

Utilities Department

Department

 

PRESENTER(S):                       Sara Hancock, Finance Director

Todd Fessenden, Utilities Director

First Name Last Name, Title

 

TIME ESTIMATE: 10 minutes

only required for non-consent items

 

POLICY ISSUES:

Based on detailed study, the proposed fee changes are needed to provide sufficient revenue to operate and maintain the Town’s existing water, wastewater, and stormwater systems and increase the tap and water dedication fees to generate sufficient revenue to expand the system to serve new development.

 

STAFF RECOMMENDATION:

Recommendation

Approve the updated tap and dedication fees.

End

 

SUMMARY AND BACKGROUND OF SUBJECT MATTER:

This ordinance was originally presented to Council for adoption on Sept. 24, following an Aug. 8 Study Session on the results of the Utility Fee and Rate Study. Council asked staff to clarify the fees related to small homes, and staff has made those clarifications to the ordinance.

 

Per Town Municipal Code: “Single-family equivalent unit (SFE): A number related to the volume of water necessary to meet the demand and use requirements, including consumptive use requirements, of an average dwelling unit on an average lot size of 7,000 square feet or less. The SFE unit value assigned to such average dwelling unit is 1.0. The SFE unit value assigned to each small home is 0.75, and an additional 0.1 SFE for each additional 1,000 square feet lot size over 2,000 square feet.” The correct value of $1,729 for additions of 1,000 square feet to small homes are in this revised ordinance. Also, the additional wastewater tap fee for Erie Gateway development of $1,561 is included in the revised ordinance. Lastly, we have increased the time upon which this Ordinance shall take effect from 10 days to 30 days after publication following adoption, to allow slightly more time for developers and home builders to make necessary adjustments.

 

The Town of Erie Financial Policies require the Town to have a formal rate study performed on the utility fund (water, wastewater, and storm drainage) charges at least every five years. Bond indentures also require the Town to ensure that its fees are adequate to ensure compliance with all bond covenants. Staff conducted the last formal rate study for these funds in 2020. In 2020, the Council reviewed and adopted the results of those rate studies, setting rates and fees for the period 2020-2024.

 

The Town began the current rate study process in late 2023. The Town contracted with Raftelis Financial Consultants (Raftelis) in August 2023 to perform the formal rate study for water, wastewater, and storm drainage monthly customer charges, water and wastewater tap fees, raw water dedication fees, and storm drainage impact fees.

 

Summary of Rate Study

The goals of the rate study are to determine the revenue needed to cover annual operations and maintenance costs and capital improvement projects, meet debt service requirements, provide for sufficient operating reserves and maintain the utility’s self-sufficiency over a 5-year period. Moving forward, staff recommends evaluating fees every two years, with a more in depth study every 4-5 years to address capital projects and rapid growth.

 

The key assumptions used in the rate study are as follows:

•                     Residential growth: 650 taps per year

•                     Target Reserves: 90 days of operations plus one year’s depreciation expense

•                     Debt Service Coverage: As required by the respective debt covenants

 

Permit-Related Fees

Water and wastewater tap fees, water dedication fees, and storm drainage impact fees (among other fees) are paid at the time of issuance of a building permit. The following discussion presents the proposed changes to these fees.

 

Water Tap Fee and Fee in Lieu of Water Dedication

These fees are collected on all new residential and non-residential construction that requires connection to the water system. These fees are a one-time charge to the customer for their proportional share of capacity of the system infrastructure in the case of the water tap fee and annual water requirements in the case of the fee in lieu of water dedication. These fees are used to defray the capital costs of expanding the system facilities and to recover the cost of growth to the system.

 

Below is a schedule of current and proposed water tap fee and fee in lieu of water dedication.

 

Potable water tap fee:

 

¾ inch6 

$17,290.00 

1 inch 

$28,820.00 

1½ inches 

$57,630.00 

2 inches 

$92,210.00 

3 inches 

$172,900.00 

4 inches 

$288,170.00 

6 inches 

$576,340.00 

Fee in lieu of water dedication2 (potable water rights fee):

 

¾ inch 

$31,400 (See also note 4)

1 inch 

See note 4 

1½ inches 

See note 4 

2 inches 

See note 4 

3 inches 

See note 4 

4 inches 

See note 4 

6 inches 

See note 4 

Non-potable water tap fee: 

 

Per acre-foot 

$17,410.00 

Notes    A Small Home is a dwelling unit described in Section 8-1-3 of this Code as having less than 1,000 square feet in size and a lot size of 2,000 square feet or less. An additional $1,729.00 may be added to this tap fee for each additional 1,000 square feet of lot size. Townhomes and Condominium Units are dwelling units described in Section 8-1-3. This tap fee shall apply to Condominium Units with individual water taps.      For residential units which require a ¾ inch potable water tap but also require an automatic sprinkler system, the ¾ inch water tap fee shall be charged, but a Fireflow Surcharge of $170.00 shall be added to said tap fee.    

 

 

(a)                     Section 8-1-9 of this Code as it may be amended, defines the manner in which the Town determines the amount of fee in lieu of water dedication.

 

 

 

Wastewater Tap Fee

The wastewater tap fee is collected on all new residential and non-residential construction that requires connection to the wastewater system. The fee is a one-time charge to the customer for their proportional share of capacity of the system infrastructure. The fee is used to defray the capital costs of expanding the system facilities and to recover the cost of growth to the system, including a significant expansion of the Town’s North Water Reclamation Facility.

 

No changes to the Wastewater Tap Fees are proposed at this time, with the exception of an additional tap fee for the Erie Gateway development which will be utilized to fund a portion of the wastewater infrastructure that specifically serves only that defined area.

 

Wastewater tap fee: 

 

¾ inch 

8,860.00 

1 inch 

14,767.00 

1½ inches 

29,533.00 

2 inches 

47,253.00 

3 inches 

88,600.00 

4 inches 

147,667.00 

6 inches 

295,333.00 

Gateway Development Wastewater Tap Fee, per Single Family Equivalent

1,561

 

Storm Drainage Impact Fee

The storm drainage impact fee is collected on all new residential and non-residential construction that requires connection to the storm drainage system. No change in these fees is proposed at this time.

 

COUNCIL PRIORITY(S) ADDRESSED:

ü                     Prosperous Economy

ü                     Effective Governance

ü                     Fiscally Responsible

 