Cost as Recommended: $120,0000
Balance Available: $230,880
Budget Line Item Number: 300-70-110-605000-100210
New Appropriation Required: No
POLICY ISSUES:
There are funds in the current budget to complete this project. This serves the Council's goal for maintaining infrastructure. A delay in this repair would lead to further deterioration of the pavement and subgrade and would result in higher future costs to complete this repair.
STAFF RECOMMENDATION:
Recommendation
Approve the resolution
End
SUMMARY AND BACKGROUND OF SUBJECT MATTER:
Although the improvements at Erie Parkway and WCR 7 were substantially complete in 2023, the 2024 Capital Budget includes funds for Erie Parkway and WCR 7.
On the west bound lane of Erie Parkway east of WCR 7, where the project tied into the existing pavement, a soft spot in the subgrade of the roadway has developed over the last year. Upon initial observation of this area, staff recommended rolling the funds into 2024 to address this deficiency in 2024.
In February of 2024, the Town entered into an agreement with JUB, the original design engineer for the Erie Parkway and WCR 7 intersection project, to evaluate the cause of the soft spot in the road. JUB had their sub-consultant, Terracon, drill soil borings to evaluate the subgrade and take asphalt samples to evaluate the new asphalt. Based on the evaluation Terracon provided the Town, it was determined that the soft spot was not the fault of the Contractor, but the subgrade condition under the pavement section.
Terracon recommended removing the asphalt and unsuitable subgrade and replacing it with stabilized s...